DRAFT 08/27/03
Order of Installation
The numbered steps below correspond with the order of installation for the listed components.
1.
Determine the type of wall (D) and construction type (see figure 2 on page 4).
2.
Install the medical gas drops (E).
3.
Perform one of the following:
•
To install the vertical chase (with a breaker panel) (B), install the vertical chase
hanger bracket and the vertical chase with a breaker panel (B).
•
Install the vertical chase (without a breaker panel) (C).
4.
To install the raceway (A), perform the following:
a.
Install the raceway hanger bracket (F).
b.
Position and install a single section of raceway (A).
c.
Mount multiple sections of raceway (A).
d.
Connect the gas pipe.
5.
To install the covers, perform the following:
a.
Install the gas pipe cover (G).
b.
Install the vertical chase bottom cover (H).
Summary of Contents for Itegris 2001B
Page 2: ......
Page 6: ...Table of Contents Page iv is444re October 13 2003 DRAFT 08 27 03 NOTES...
Page 10: ...Page 4 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 2 Component Identification...
Page 12: ...Page 6 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 3 Fasteners...
Page 14: ...Page 8 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 4 Medical Gas Drops Finished floor...
Page 24: ...Page 18 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 9 Hanger Bracket Installation...