5.
Adjust the raceway (A) laterally, routing the wiring from the end of the raceway (A)
into the appropriate area of the junction box in the vertical chase (B, C) (see figure 10
on page 19).
6.
Perform one of the following to secure the raceway (A) through the endplate and into
the wall (D):
•
For seismic walls, install the self-drilling hex head screws (I) (see figure 3 on
page 6).
•
For non-seismic, non-fire-rated construction, install the E-Z Ancor®
1
screw
anchors (U) and the pan head screws (V), or install the slotted round screws
(K), toggle wings (L), and cup washers (J) (see figure 3 on page 6).
7.
Locate the installation clips (M), provided in the bag assembly, and align them with
the wall studs.
8.
Install the truss head screws (N) to secure the installation clips (M) (see figure 3 on
page 6) to the raceway (A) (see figure 10 on page 19).
9.
Install the self-drilling hex head screws (I) to secure the installation clips (M) (see fig-
ure 3 on page 6) to the wall (D) (see figure 10 on page 19).
10.
Install two #12 hex head screws (O) through the vertical chase (B) or (C) and into the
raceway (A).
NOTE:
Installation of the #12 hex head screws is required to meet National Electrical Code®
2
(NEC®
3
) Article 517, Redundant Ground Requirements.
11.
Make the wiring connections.
12.
Go to “Connecting the Gas Pipe” on page 22.
1. E-Z Ancor® is a registered trademark of Illinois Tool Works, Inc.
2. National Electrical Code® is a registered trademark of National Fire Protection Association, Inc.
3. NEC® is a registered trademark of National Fire Protection Association, Inc.
Summary of Contents for Itegris 2001B
Page 2: ......
Page 6: ...Table of Contents Page iv is444re October 13 2003 DRAFT 08 27 03 NOTES...
Page 10: ...Page 4 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 2 Component Identification...
Page 12: ...Page 6 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 3 Fasteners...
Page 14: ...Page 8 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 4 Medical Gas Drops Finished floor...
Page 24: ...Page 18 of 24 is444re October 13 2003 DRAFT 08 27 03 Figure 9 Hanger Bracket Installation...