Face Recognition Swing Barrier Installation Guide_V1.1-20190215.docx
Product Support Team
7
3
)
Draw a central line on the installation surface for installing the center pedestal.
4
)
Draw another two parallel lines on each side of the central line for installing the other two
pedestals.
Note:
The distance between the nearest two line is L+200 mm. L represents the lane width.
5
)
Confirm ground drill hole place on both sides according to Figure 2.
6
)
Drill holes on the ground according to the installation holes on the pedestals and insert the
expansion sleeves, each channel need 6*M12 screws.
7
)
Bury interconnecting cables for pedestal communication.
Note:
For detailed information about burying and wiring interconnecting cables, see Wiring
Interconnecting Cable.
8
)
According to the entrance and exit marks on the pedestals, move the pedestals to the
corresponded positions.
Note:
Make sure the installation holes on the pedestals and the base are aligned with each
other.
9
)
Secure the pedestals with expansion bolts.
Note:
Do not immerse the pedestal in the water. In special circumstances, the immersed
height should be no more than 10 mm.
Figure 4 Installation top view
2.2
Barrier Wiring
1
)
Wire electric supply with the switch in the pedestal. Terminal L and terminal N are on the
switch, while terminal PE should connect to a ground wire (yellow and green wire).
;