
29
SECTION 03
Now tighten all the screws to keep the BGAN terminal in the
pointed position. The LED will now flash green indicating that
network verification is in progress.
3.
The BGAN terminal will automatically exit the pointing process
once it has detected a stable signal, and the beeping will stop
automatically. The LED will first turn to a steady green, and then
switch off. This can take up to 5 minutes.
Please see Table 01:
BGAN LED status indicator
for more information.
4.
FIG. 12.3
When the BGAN satellite connection is established successfully
the LED status indicator on the Hiberband Via gateway will
turn blue, indicating the system is powered, operational, and
connected to the internet.
5.