FRU Replacement Guide
4 Storage Node Replaceable Units
43
c) In the
Commands
pane, click
Shutdown
.
Figure 21: The Shutdown Button in the Commands Pane
d) Wait for the
Status
field to change to
DONE
.
Warning:
Even if all LEDs are off, you must still wait until the CMC shows
DONE
in the
Status
field.
All I/O to the Storage Enclosure Basic attached to this Storage Node is now quiesced.
3.
Go to the rack and identify the correct chassis by the blinking blue LED on its front and back panels.
4.
Remove the failed chassis from the rack.
a) At the front of the chassis, loosen the rack mounting screws.
b) At the back of the chassis, disconnect the three network cables connected to the ports labeled as follows in the
image below.
Note:
Check that the cables are labeled correctly, so that you can put them back in the same
order.
a. N1
(Public network #1)
b. N2
(Public network #1)
c. M2
(IPMI)
d. S1
(Storage network #1)