Contents
Container
• 2 Rack Latch brackets (One Left, One
Right)
• Screws & Nuts
10 M5 Cagenuts
30 M5 x 12, T15 Torx screws
2 M5 x 12 Philips Panhead screws (for
cover retention)
16 Custom Round Washers
• Cables
2 C13 to C14 Power Cables (3m)
2 Rack Rails w/ 1 Inner Rail per Rack Rail
Rails Box
Chassis w/ all internal components pre-installed except
drives and SSDs.
Chassis
4 with 14 driver per container, 1 with 4 HDDs and 8 SSD
assemblies.
5 Drive boxes
4.2
Ultrastar 8 Unpacking Procedure
1. Make sure that all of the necessary equipment is available, including any equipment necessary to support
the enclosure during installation. To verify the list of necessary equipment, see:
on page 28.
2. Cut the straps that secure the packaging to the pallet with a box cutter.
29
4
Packaging
Installation Guide
4.2
Ultrastar 8 Unpacking Procedure