f) Align the front of the rail with the holes on the rack posts that will receive the rails and pull the rail
toward the holes until the toolless latching mechanism engages the rack.
Figure 15: Front Rail Release Clip Operation
Clic
k!
g) Use a level to make sure that the rails are aligned properly.
h) Follow these steps for the other outer rail.
5.
Install five M5 cage nuts, per side, starting at the uppermost rack mounting hole of the 4U space on the
front of the rack.
a) Install one cagenut at the uppermost mounting hole of the 4U space that the enclosure will occupy.
37
5
Installation
Installation Guide
5.2
Ultrastar 8 Installation Procedure