
3/17
Operation
2.73m
3
Operation *
2.74m
3
Description of the display and operating features
A On/Off switch
Only the surface-mounted variant is equipped with an
On/Off switch. Use this switch to switch the unit on or off.
B LC Display
Two lines with 16 characters, backlit.
C LED “Alarm”
Indicates an error message. The LED flashes if the output
AL has not been activated.
D LED “Desalination”
Indicates a current desalination.
E "ENTER" key
Confirm inputs and trigger functions via the ENTER key.
F Arrow keys
Use these keys to operate the menu drive in the display
and to enter values and programming data.
G "M" key
Call the menu and return to the submenu levels
H "Fault OFF" key
Deletes the alarm signal at the output AL (Alarm), a fault
display can only be deleted once the fault has been
eliminated.
Operating Displays
Each status change is stored in the status history (e.g. manual or automatic desalination).
Plant is in operation with 2.73m
3
additional water consumption (supply quantity).
Plant is in operation with 2.74m
3
additional water consumption (supply quantity).
* = Dosing output is switched for the programmed time.