28
Operation
Once the rechargeable battery is fully charged, the LED on the
char
ger will go out following an approx. 1-hour delay.
The charging process will end automatically� The charging times
are provided in the technical specifications (see Chapter
“Techni-
cal specifications” on page 47).
Fig. Rechargeable battery
charging slot (example)
Depending on the model, the
charging slot is located on the top
or bottom of the frame�
1 Charging slot
1
•
If the rechargeable battery is not fully charged after the charg-
ing time specified in the technical specifications, read Chapter
“Troubleshooting” on page 41
�
5�
Once the rechargeable battery has been fully charged, pull
the chargingplug out of the rechargeable battery�
6�
Pull the mains plug out of the socket.
note:
You can also end the charging process before the recharge-
able battery is fully charged (e.g. for storage) (see Chapter
“Storing
the rechargeable battery” on page 17
)�
10.2
e-bike
CauTIon
The e-bike may respond in a manner other than you
expect if operated incorrectly.
risk of injury!
•
Read the Chapter
“Operation” on page 22
completely
before you switch it on for the first time�
noTICe
Improper operation may lead to malfunctioning and dam-
age�
risk of damage!
•
Once the charging process is complete, wait one minute
before switching on the e-bike�
Summary of Contents for STEPS DIN EN 15194
Page 2: ......
Page 50: ......
Page 51: ......
Page 52: ...Sales Hermann Hartje KG Tel 49 0 4251 811 90 info hartje de www hartje de Presented by ...