
Z
© 2016 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.
Part no. 1BHH19 rev C.
TM
Y
,
L
, Canvas are among the trademarks of Herman Miller, Inc.
Illustrations and specifi cations are based on the latest product information available at the time of publication.
The right is reserved to make changes in design and specifi cations at any time, without notice, and also to discontinue products.
9
YT250.
1. Position Steel Screen (AN) under work surface. Make sure tabs on mounting
brackets are tight against edge of work surface.
2. Mark Hole locations.
3. Drill 1/8” pilot holes. Be sure not to drill through work surface.
4. Secure screen to work surface with torx screws (AP).
AN
AP
Drill Holes
Mounting Bracket
Tab
Work Surface
Mark Holes