![Hercules ALASSIO Translation Of The Original Operating Instructions Download Page 49](http://html1.mh-extra.com/html/hercules/alassio/alassio_translation-of-the-original-operating-instructions_2125701049.webp)
034-11421_1.0_11.10.2017
47
Transportation, storage and assembly
Initial commissioning includes the following work:
Check the battery [
Chapter 5.3.3.1, page 48
].
The battery is supplied partially charged. In order to
guarantee full power, charge the battery fully.
Install the
wheels with quick release
and the
pedals
.
Move the
handlebars
and
saddle
into the functional
position.
Check all the components to make sure that they
are firmly in place.
Check all the settings and the tightening torque of
the axle nuts.
Check the entire cable harness to make sure that it
is routed properly:
• You must prevent the cable harness from coming into
contact with moving parts.
• The cable routes must be smooth and free from sharp
edges.
• Moving parts must not apply any pressure or tension
to the cable harness.
Set the
lamp
.
Check the drive system, the light equipment and
the brakes to make sure that they are fully
functional and effective.
Set the drive system has to the national language
and the appropriate system of measurement.
Check the software version of the drive system and
update it as necessary.
Axle nut tightening torque
35 Nm - 40 Nm
Table 27:
Axle nut tightening torque
EN_034-11421_0.1_0.01_09.18_HERCULES BROSE_CS_Inhalt.book Page 47 Wednesday, October 11, 2017 9:53 AM