3.3 Disposal / recycling
Disposal must be carried out professionally and in an environmentally friendly way in
accordance with the respective national legal stipulations.
"
Separate the materials by type and in an environmentally friendly way.
"
If necessary, commission a specialist company with the waste disposal.
4 Mounting
•
Before installation remove the device from the packing and check for any possible
shipping damage!
•
Assemble the device on a clean and stable base. Do not distort during assembly! Use
the appropriate mounting devices for proper installation of the unit!
•
Use the templates printed on the device packing to mark the fastening bore holes.
•
The pressure measuring depends on position, therefore the mounting must be made
vertical and as possible on a vibration-free place (cable inlet and pressure connec-
tions down).
•
The pressure line
´
s connection should be with plastic-hose (in building), inside diam-
eter 4 / 5 mm. For a
fi
rm hold of the hose, its inside diameter must be 1 mm smaller
than the outside diameter of the hose nozzle (step spigot 5 / 6 mm).
•
Remove the connection cover for mounting and electrical connection. Close the lid
again carefully before start-up (tightening torque of the lid screws 1.1 Nm).
Vertical mounting
G
e
h
ä
u
se
h
o
u
si
n
g
1
1
1
mm
Gehäuse /
housing
106 mm
1
1
mm
8
3
mm
91 mm
Schraube
max 4,5 mm
screw max
4,5 mm
Bohrschablone
drilling template
Drilling template on packing
Installation and Operating Speci
fi
cation
EDR
Mounting
L-BAL-E292-GB 1841 Index 001
Part.-No.
5/15