9 Commissioning
42
KRONOS 20
9
Commissioning
9.1
General Safety Information for Commissioning
All commissioning tasks must be carried out exclusively by trained per-
sonnel and in conformity with current standards and regulations.
The operator is also responsible for putting the technical installation as a whole into opera-
tion correctly.
Before commissioning the installation, please note:
•
Before starting to install any equipment, the installation must have been switched off!
•
Check the function ability of the existing protection and monitoring systems.
The system may be put into operation only if the terminal box cover is mounted.
9.2
General Information on the first Engine Start
•
Adjust speed pickup distance according to the instructions.
•
Verify that the software is correct and the main parameters: engine data, number of
teeth, mixer data, gas valve data, sensor data, gas data, lambda data etc.!
•
If required, adjust sensors.
•
Before
the engine is started, test the electric connections and the basic functioning of
the system in positioning mode (parameters 5705 and 5706)!
•
It is recommended to begin by starting the engine first without connecting a control
unit.
Ensure adequate overspeed protection!
•
Start the engine after pre-setting according to the description below.
•
Optimization of lambda map and correction values as described below.
Knock protection must be active or attention must be paid to audible
knocking.
Warning
Warning
Danger