![Heidolph Hei-VOLUME Distimatic Pro Assembly Instructions Manual Download Page 93](http://html1.mh-extra.com/html/heidolph/hei-volume-distimatic-pro/hei-volume-distimatic-pro_assembly-instructions-manual_2118935093.webp)
90
Assembly
Educt supply & residue draining
➜
Required tube: PTFE, transparent (included, sold by the meter).
➜
Position the educt container and the residue container in the place of use and cut
the two pieces of tube to the required lengths between the container and valve
matrix.
➜
Fit the tube ends, which are plugged into the valve matrix, in the angle clips
supplied for this purpose (see figure, Item [1] and [2]).
Make sure that the free end of the tube protrudes from the
angle clip far enough to ensure a secure connection to the tube
connector!
➜
Educt supply: Tube connection [1] is used to supply the system with educt. Route
the tube [1] from the educt sensor vessel into the educt container.
➜
Residue draining: Tube connection [2] is used to drain the residue from the system.
Route the tube [2] from the residue valve into the residue container.
Summary of Contents for Hei-VOLUME Distimatic Pro
Page 22: ...19 Aufbau Installation Schlauchverbindungen Anschlussblock Halteblech 2 Kollektorgef...
Page 50: ...Assembly instructions Page 50 94...
Page 68: ...65 Assembly Tube connection vacuum unit compressor Distimatic Pro buffer vessel inlet...
Page 69: ...66 Assembly Tube connection buffer vessel outlet vacuum connection socket...
Page 70: ...67 Assembly Tube connection terminal block mounting plate 2 collector vessel...
Page 98: ...Instructions d assemblage Page 98 142...
Page 118: ...115 Montage Raccords de tuyaux bloc de raccordement t le de support 2 r cipient collecteur...