Fig. 4: Clamping on short side 

Slip-prevention 

Our  module  frames  are  supplied  with  drill-holes  for  the  purposes  of  slip-prevention  when  installed  in  an  inclined  position, 
and to make them easier to fit. Cylinder-head bolts with Allen-key sockets are inserted into these holes in the module frame. 
The  bolts  are  secured  in  place  with  a  plain  washer  and  nut,  or  a  self-locking  nut.  The  use  of  M  5  x10  VA  bolts  with 
corresponding toothed lock-washer and nut is recommended for anti-slip purposes. 

Module load capacity 

Heckert  Solar’s  standard  modules  are  certified  by  TÜV  Rhineland  to  handle  loads  of  up  to  5400  Pa.  SOLRIF

®

-type  and 

frameless  solar  modules  have  been  tested  at  loads  of  up  to  2400  Pa.  The  load  capacity  of  the  SOLRIF

® 

modules  can  be 

increased  significantly  by  using  additional  mounting  boards  as  support  (please  find  more  information  on  that  in  the 
calculation tool “Prosolrif” by the company Schweizer). 

CAUTION:  Please  note  that  the  modules  can  only  achieve  their  maximum  load  performance  if  they  are 
clamped in the specified clamping area and in compliance with all requirements. 

Ensure  that  the  maximum  mechanical-load  capacity  is  observed,  paying  particular  attention  to  the  load  factors  present  at 
the site of installation (such as those resulting from wind and snow, etc. See also DIN 1055-4/5). Note that the module may 
buckle  when  subjected  to  excessive  loads.  Do  not  use  any  material  that  may  result  in  the  module  being  exposed  to,  and 
therefore  damaged  by,  sharp  or  pointed  edges,  or  uneven  structures.  The  snow  load  at  base  sk  (measured  in  kN/m²)  is 
calculated using local levels of snowfall, the location of the building and its height above sea level. The likely wind load for 
the site of the project should be estimated using a wind-zone chart that along with wind zones also takes into account local 
conditions.  A  simplified  procedure  can  be  used  to  estimate  prevailing  wind-load  when  considering  buildings  of  up  to  25 
metres  in  height.  Depending  on  the  height  of  the  building,  wind  load  is  expressed  as  velocity  pressure  q,  measured  in 
kN/m³. Wind-load charts and snowfall maps are available for download from websites such as:  

http://de.wikipedia.org/wiki/Schneelast 
http://de.wikipedia.org/wiki/Windlast 

CAUTION: Please note that the specialist firm engaged to fit the system is solely responsible for the planning 
and  implementation  of  the  project,  and  that  a  separate  set  of  structural  static  calculations  may  have  to  be 
drawn up in certain cases.

 

6. Connection and hook-up of modules 

 

The modules are wired directly via the plug socket fitted to the connection box (Fig. 5): 
Left-hand pin connector (+); right-hand pin connector (-) 
All sockets used for this purpose must be of the authorised type supplied by Tyco. The use of plug-in connectors of 
any other kind will void the warranty. 

 

The unit is supplied ready-fitted with a 1.9 metre length of cable on the positive (left-hand) side. This cable is fitted 
with the corresponding positive (+) and negative (-) sleeve connectors.  

Summary of Contents for NeMo 54 P 195

Page 1: ...Installation and Operating Instructions www heckert solar com 03 12 2014 Manufactured with sustainable energy Installation and Operating Instructions...

Page 2: ...alent of the corresponding mains network operator along with the relevant health and safety and accident prevention measures Failure to observe these stipulations may result in grave personal injury o...

Page 3: ...nverter while under load can result in fatal injury due to arcing NEVER disconnect the solar generator from the power inverter while it is still connected to the network 2 General information regardin...

Page 4: ...ote and reported immediately in writing Our modules are normally delivered in an upright position on a non returnable pallet so that one person can remove the individual units without risk of back inj...

Page 5: ...itions You should therefore multiply the module s indicated Isc and Uos values by a factor of 1 25 when determining the voltage ratings of components current ratings of conductors and sizes of fuse fo...

Page 6: ...snow load and type of roof rafter or purlin type may require the fitting of a set of crossbars Please consult with Heckert Solar before considering any other type of installation The modules must not...

Page 7: ...any material that may result in the module being exposed to and therefore damaged by sharp or pointed edges or uneven structures The snow load at base sk measured in kN m is calculated using local lev...

Page 8: ...perly inserted Plug in connectors conform to protection class IP67 and sockets to IP65 Both components are therefore permanently protected from dust Please pay careful attention to the instructions su...

Page 9: ...ig 7 Max Systemspannung Max system voltage Tension syst me maxi 1000 VDC Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre NeMo 54 P 195 26 Ne...

Page 10: ...int For integrated roof construction of the HS_P M xxx_4 Solrif R modules on e g slate shingle seam concrete tile etc an additional test for external fire spread according to the standards ENV 1187 4...

Page 11: ...GmbH Carl von Bach Strasse 11 D ll liability for infringement of patents or other third party rights that might arise from the operation of these modules is likewise excluded unless otherwise specific...

Page 12: ...12...

Page 13: ...ng the wire in place squeeze the crimp tool handles together until the ratchet releasses 4 Pressed Asembled Push contact with cable into the connector housing until you hear the contact give audible c...

Reviews: