background image

10 

 

If  the  building  is  already  fitted  with  an  external  lightning  conductor  (or  if  one  is  to  be  installed),  the  PV  system  must  be 
suitably  integrated  to  prevent  direct  lightning  strikes.  If  power  inverters  without  a  transformer  are  used,  they  must  be 
suitably  earthed  (grounded)  to  provide  personal  protection  and  compensate  for  the  lack  of  galvanic  isolation.  Applicable 
local and national regulations are to be observed in this respect. 

   

                                                            

 

 

Fig. 8: Identification of earthing (grounding) point NeMo®; Solrif® 

When using SOLRIF

®

 modules, the Schweizer specifications regarding equipotential bonding and lightning protection, which 

are included in the fitting instructions, should be observed. 

 
Fire prevention 

The  fitting  of  equipment  to  the  roof  may  affect  the  fire  safety  of  the  building  concerned,  as  incorrect  installation  can 
suppose  a  fire  hazard.  Please  observe  local  planning  laws  and  building  regulations.  Heckert  Solar-brand  modules  forming 
part of a rooftop installation must be fitted onto a fire-resistant base material. The module is classed as a “non-explosion-
protected” item of equipment. It must therefore not be installed anywhere near the volatile gases and fumes found in places 
such  as  filling  stations,  gas-storage  facilities  or  paint-spraying  workshops.  The  module  must  not  be  installed  near  naked 
flames or inflammable materials. 

Heckert Solar’s modules were tested for fore performance and conform to fire protection class B2. 

Fire  brigades  have  special  fire-fighting  guidelines  at  their  disposal  for  buildings  fitted  with  power-generating  photovoltaic 
systems. We recommend the clear identification of the PV system, and the display of a layout plan at the building’s power 
connection box and main distribution point. 

For  integrated  roof  construction  of  the  HS_P(M)xxx_4  Solrif(R)  modules  on  e.g.  slate,  shingle,  seam,  concrete  tile  etc.  an 
additional test for external fire spread according to the standards ENV 1187-4 or BS476-3 is required. 

Working on the roof 

Please  observe  the  applicable  accident-prevention  regulations.  Do  not  carry  out  installation  work  in  strong  winds.  Secure 
yourself and other persons to prevent accidents due to falls. Secure loose objects to prevent them falling.  
Cordon off the working area to prevent any third-party damage or injury. 
 
7. Return and recycling 

Heckert  Solar  GmbH u ndertakes t o a ccept t he r eturn,  free  of  charge,  of  modules  produced  by  the  company,  when  they 
reach  the  end  of  their  service  life.  For  details  of  returns  for  other  reasons,  please  refer  to  the  document  entitled 
“Return_Recycling.pdf”, which can be found on our website at 

www.heckert-solar.com

8. Product/performance guarantee 

For further information on terms and conditions of use and the guaranteed performance specifications of our products, 
please go to our website at 

www.heckert-solar.com

 
9. Liability exclusion 

These  installation  and  operating  instructions  apply  to  general,  standard-designed  systems.  These  details  are  provided  for 
information  only,  and  are  not  contractual  in  any  way.  Heckert  Solar  GmbH  can  offer  no  guarantee  as  to  th

e  suitability  or 

functioning  performance  of  these  modules  if  the  user  fails  to  abide  by  the  instructions  given  in  this  user  information.  As 
Heckert Solar GmbH can in no way control or monitor conformity with this user information, local circumstances, the usage 
and conditions to which the installation is subject, the manner in which it is operated, or the maintenance of the modules 
concerned, Heckert Solar GmbH shall accept no liability whatsoever for any loss or damage that might result from incorrect 
use, installation, operation or maintenance. 

Identification of 

earthing (grounding) 

hole

 

Summary of Contents for NeMo 54 P 195

Page 1: ...Installation and Operating Instructions www heckert solar com 03 12 2014 Manufactured with sustainable energy Installation and Operating Instructions...

Page 2: ...alent of the corresponding mains network operator along with the relevant health and safety and accident prevention measures Failure to observe these stipulations may result in grave personal injury o...

Page 3: ...nverter while under load can result in fatal injury due to arcing NEVER disconnect the solar generator from the power inverter while it is still connected to the network 2 General information regardin...

Page 4: ...ote and reported immediately in writing Our modules are normally delivered in an upright position on a non returnable pallet so that one person can remove the individual units without risk of back inj...

Page 5: ...itions You should therefore multiply the module s indicated Isc and Uos values by a factor of 1 25 when determining the voltage ratings of components current ratings of conductors and sizes of fuse fo...

Page 6: ...snow load and type of roof rafter or purlin type may require the fitting of a set of crossbars Please consult with Heckert Solar before considering any other type of installation The modules must not...

Page 7: ...any material that may result in the module being exposed to and therefore damaged by sharp or pointed edges or uneven structures The snow load at base sk measured in kN m is calculated using local lev...

Page 8: ...perly inserted Plug in connectors conform to protection class IP67 and sockets to IP65 Both components are therefore permanently protected from dust Please pay careful attention to the instructions su...

Page 9: ...ig 7 Max Systemspannung Max system voltage Tension syst me maxi 1000 VDC Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre NeMo 54 P 195 26 Ne...

Page 10: ...int For integrated roof construction of the HS_P M xxx_4 Solrif R modules on e g slate shingle seam concrete tile etc an additional test for external fire spread according to the standards ENV 1187 4...

Page 11: ...GmbH Carl von Bach Strasse 11 D ll liability for infringement of patents or other third party rights that might arise from the operation of these modules is likewise excluded unless otherwise specific...

Page 12: ...12...

Page 13: ...ng the wire in place squeeze the crimp tool handles together until the ratchet releasses 4 Pressed Asembled Push contact with cable into the connector housing until you hear the contact give audible c...

Reviews: