background image

 

 

 

Installation and Operating Instructions 

These  instructions  are  intended  for  the  use  of  dealers  and  fitters  engaged  in  the  design,  installation  and  operation  of 
photovoltaic (PV) systems consisting of high-performance, polycrystalline or monocrystalline solar modules from the range 
supplied by Heckert Solar GmbH. They are designed to ensure that the PV system concerned delivers optimum performance 
throughout  its  working  life.  All  Heckert  Solar-brand  modules  are  manufactured  in  Germany,  and  are  among  the  highest-
quality  PV  units  of  their  type  to  be  found  anywhere  in  the  world.  They  are  characterised  by  extremely  high  standards  of 
workmanship and long-term stability. 

Heckert Solar-brand modules may only be installed by properly-qualified specialists. Please observe the relevant norms and 
standards  applying  to  photovoltaic  installations,  including  –  for  example  –  VDE  regulations,  DIN  standard  specifications, 
VDEW guidelines and TAB (Technical Advisory Authority) standards (or local equivalent) of the corresponding mains network 
operator, along with the relevant health and safety and accident-prevention measures. Failure to observe these stipulations 
may  result  in  grave  personal  injury  or  serious  damage  to  systems  and  equipment.  The  indications  contained  in  these 
installation and operating instructions are based on current German legislation and industrial standards. 

The recommendations that  follow are designed to help ensure the smooth,  trouble-free installation of  your  Heckert Solar-
brand  modules.  Please  seek  expert  advice  in  the  event  of  individual  queries,  and  in  order  to  ensure  that  the  roof 
specifications are observed. 

Keep these instructions in a safe place, along with all the other documents supplied with the system. 

These  installation  and  operating  instructions  conform  to  the  stipulations  of  TÜV  Rhineland  regarding  safety  certificate  IEC 
61730, part 1. 

 

 

 

 

 

 

 

Overview 

1.

 

Hazard warnings and safety instructions  

2.

 

General information regarding PV systems 

3.

 

Delivery and handling of modules 

4.

 

Information regarding the module 

5.

 

Module installation 

6.

 

Connection and hook-up of modules 

7.

 

Return and recycling 

8.

 

Product/performance guarantee 

9.

 

Exclusion of liability 

 

 

 

 

Summary of Contents for NeMo 54 P 195

Page 1: ...Installation and Operating Instructions www heckert solar com 03 12 2014 Manufactured with sustainable energy Installation and Operating Instructions...

Page 2: ...alent of the corresponding mains network operator along with the relevant health and safety and accident prevention measures Failure to observe these stipulations may result in grave personal injury o...

Page 3: ...nverter while under load can result in fatal injury due to arcing NEVER disconnect the solar generator from the power inverter while it is still connected to the network 2 General information regardin...

Page 4: ...ote and reported immediately in writing Our modules are normally delivered in an upright position on a non returnable pallet so that one person can remove the individual units without risk of back inj...

Page 5: ...itions You should therefore multiply the module s indicated Isc and Uos values by a factor of 1 25 when determining the voltage ratings of components current ratings of conductors and sizes of fuse fo...

Page 6: ...snow load and type of roof rafter or purlin type may require the fitting of a set of crossbars Please consult with Heckert Solar before considering any other type of installation The modules must not...

Page 7: ...any material that may result in the module being exposed to and therefore damaged by sharp or pointed edges or uneven structures The snow load at base sk measured in kN m is calculated using local lev...

Page 8: ...perly inserted Plug in connectors conform to protection class IP67 and sockets to IP65 Both components are therefore permanently protected from dust Please pay careful attention to the instructions su...

Page 9: ...ig 7 Max Systemspannung Max system voltage Tension syst me maxi 1000 VDC Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre NeMo 54 P 195 26 Ne...

Page 10: ...int For integrated roof construction of the HS_P M xxx_4 Solrif R modules on e g slate shingle seam concrete tile etc an additional test for external fire spread according to the standards ENV 1187 4...

Page 11: ...GmbH Carl von Bach Strasse 11 D ll liability for infringement of patents or other third party rights that might arise from the operation of these modules is likewise excluded unless otherwise specific...

Page 12: ...12...

Page 13: ...ng the wire in place squeeze the crimp tool handles together until the ratchet releasses 4 Pressed Asembled Push contact with cable into the connector housing until you hear the contact give audible c...

Reviews: