63
Heatilator • RAVE32-IFT-B, RAVE36-IFT-B, RAVE42-IFT-B Installation Manual • 2619-983 Rev. U • 9/22
Figure 10.8 Finishing Material installed with Passive Heat Optional Heat Management System
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. MIN. OPENING
MUST NOT BE
BLOCKED
CEILING
CEILING
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. MIN. OPENING
MUST NOT BE
BLOCKED
CEILING
12-1/4 IN.
8-3/4 IN.
SIDE DISCHARGE
(DISCHARGE SLOTS ON BOTH SIDES OF APPLIANCE)
FRONT DISCHARGE
OPEN TOP DISCHARGE
*
= Mesh screen required for front discharge or open top discharge passive heat installations with
discharge opening of 3 inches or greater.
2 IN. MIN.
*
2 IN. MIN.
*
Finishing Material Installed with Passive Heat Optional Heat Management System