7065-144D • 20 August, 2018
25
Heatilator EcoChoice WINS18
www.heatilator.com
Figure 25.1
1
2
4
3
H. Tube Channel Assembly Replacement
Removing Tube Channel Assembly
1. Remove the right side bricks (3 pieces).
2.
Remove the baffle protection channel by rolling forward
and out of the firebox.
3.
Locate the 2 channel nuts and 2 channel bolts inside of
chamber and remove.
NOTE:
Soak the bolts with penetrating oil for at least 15
minutes before trying to remove them.
4.
Slide the tube channel assembly all the way to left until
it is off the threads. Drop the right side down, then slide
the assembly back to right.
5.
The ceramic blanket and both baffle boards can be
removed at the same time you remove the tube channel
assembly.
6. When the tube channel assembly is free of the left side
support, rotate clockwise and pull assembly, blanket
and baffles out through the front opening.
7. Re-install in reverse order.
Tube Channel Nuts
Ceramic
Blanket
Baffle Boards (x2)
Baffle Protection
Channel