
35
A tap is provided on the outlet side of the gas control for
a test gauge connection to measure the manifold
pressure. To measure inlet pressure, provisions must be
made to attach a test gauge to the tap immediately
upstream of the gas supply connection to the stove.
The stove and its individual shut-off valve must be
disconnected from the gas supply piping system during
any pressure testing of the system at test pressures in
excess of 60 mbar.
If the stove must be isolated from the gas supply piping
system by closing an individual shut-off valve, it must be
of the handle-less type.
NOTE: Electrical wiring must be installed by a
competent electrician.
For Standing Pilot Ignition Wiring
Appliance Requirements
•
This appliance
DOES NOT
require 230 VAC to operate.
WARNING: DO NOT CONNECT 230 VAC TO
THE GAS CONTROL VALVE OR THE
APPLIANCE WILL MALFUNCTION AND THE
VALVE WILL BE DESTROYED
.
Optional Accessories
Optional fan and remote control kits require that 230
VAC be wired to the factory installed junction box
before the stove is permanently installed.
Remote Wall Switch
Position the remote wall switch in the desired position
on a wall. Run a maximum of 7.8 m or less length of
1.02 mm diameter minimum wire and connect it to the
stove ON/OFF switch pigtails.
Step 8
Wiring the
Fireplace
!
Pressure requirements for Heat-N-Glo gas fireplaces
are shown in the table below.
Step 7
Gas Pressure
Requirements
______________________________________________________________
Natural Gas Propane
Butane
Natural Gas
(G20)
(G31)
(G30)
(G25)
Inlet Pressure
20mbar
37 or 50mbar 30 or 50mbar 25mbar
Manifold Pressure
4-8.7mbar
15.7-25mbar 15.7-25mbar
4-8.7mbar
Gas Rate
.54
m3
/
h
.24
m3
/
h
.16
m3
/
h
.54
m3
/
h
Max.Input(NETCV)
5.1 kW
5.8 kW
5.1kW
4.8 kW
Burner Injector
DMS 44
DMS 54
DMS 56
DMS 44
Pilot Injector
51
30
30
51