Heat-N-Glo CFX-ZC Installer'S Manual Download Page 15

15

Step 7.    Installing Logs and Ember Material

Positioning the Logs

If the gas logs have been factory installed they should not
need to be positioned.

If the logs have been packaged separately, refer to the
installation instructions that accompany the logs.

 Save

the log instructions with this manual.

If sooting occurs, the logs might need to be repositioned
slightly to avoid excessive flame impingement.

Placing the Ember Material

Three separate bags of ember material are shipped with
this gas appliance. The bag labeled Golden Ember (GE-
93) is flame colorant material. The bags labeled Glowing
Ember (050-721) is standard glowing ember material.

To place the ember material:

Open the left and right door panels on surround.

Unlatch the latches at the right and left sides of the
glass door by pulling latch towards you and away from
fireplace (see Figure 9).

Remove the glass door from the unit.

Figure 9. Glass Assembly Latch

Place a dime size piece of glowing ember material near
port holes in burner top, sides and front (see Figure 10).

Figure 10.  Placement of the Ember Material

Space ember pieces about a 1/2 inch apart.

Never press embers into burner ports.

Cover the top of the burner with a single layer of ember
material. Then sprinkle GE-93 (Golden Ember) on top of
the burner.

Save the remaining ember materials for use during fire-
place servicing. The embers provided are sufficient for 2
to 4 applications.

Replace the glass door.

Re-install and latch the glass door.

Combustible materials 

MUST NEVER

 overlap

onto the front face.

NOTE:

 REMOVE GLASS DOOR ASSEMBLY

FROM THE INSERT BEFORE SURROUND
INSTALLATION.

1. Find the coiled low voltage wires and ON/OFF

switch attached to outer right side of the insert
(Figure 11).

2. Disconnect the ON/OFF switch from the low

voltage wire leads, and insert the ON/OFF
switch through the hole at the upper right corner
of the surround  - it will be retained in the hole.

Step 8.  Installing Trim Surrounds

Figure 11.

EMBER

MATERIAL

ON/OFF

SWITCH

SURROUND

FIREBOX

SURROUND

WITH TRIM

PULL TO

 UNLATCH

GLASS LATCH

Summary of Contents for CFX-ZC

Page 1: ...EFERENCE Please contact your Heat N Glo dealer for any questions or concerns For the number of your nearest Heat N Glo dealer please call 1 888 427 3973 Printed in U S A Copyright 2003 Heat N Glo a di...

Page 2: ...DERSTAND all instructions carefully before starting the installation FAILURE TO FOLLOW these installation instructions may result in a possible fire hazard and will void the warranty Prior to the firs...

Page 3: ...16 After the Installation 16 Section 4 Maintaining and Servicing Your Appliance 17 u u Contains updated information TABLE OF CONTENTS Safety and Warning Information 2 Service Parts List 4 Section 1 A...

Page 4: ...ros de pi ce se trouve la page suivante 6 1 10 2 10 4 8 3 7 9 5 Log Set Assembly 11 12 13 14 15 17 17 16 NG LP Exploded Parts Diagram GN PL Vue clat e des pi ces Service Parts CFX ZC Beginning Manufa...

Page 5: ...leuse GN 571 517 Pilot Orifice LP Orifice de veilleuse PL 571 516 Thermopile Thermopile 060 512 Thermocouple Thermocouple 571 511 ON OFF Rocker Switch Interrupteur bascule marche arr t 060 525A Pilot...

Page 6: ...ce of local codes with the National Electric Code ANSI NFPA No 70 in the United States or to the CSA C22 1 Canadian Electric Code in Canada These models may be installed in a bedroom or bed sitting ro...

Page 7: ...for recessed in stallations into solid fuel Masonry or Factory Built Non Combustible fireplaces that have been installed in ac cordance with the National Provincial State and local building codes 2 Mi...

Page 8: ...6 1 4 413mm NOTE If exhaust collar on insert and fireplace damper do not line up add 4 inches 102mm to minimum fireplace height for bends in vent pipe 11 279mm 5 1 2 139mm 16 1 8 410mm 16 406mm 4 5 8...

Page 9: ...t to the end of the last section of vent pipe See dimension V in Figure 3 Vent System Approvals A vertical vent termination system installed on this model will include one 1 length of 3 inch flexible...

Page 10: ...tion cap and to the top of the flexible vent pipe and set the cap in place at the top of the chimney See Figures 3 4 and 5 CAUTION TO AVOID DOWNDRAFTS AND OR COLD AIR PROBLEMS IT IS RECOMMENDED TO SEA...

Page 11: ...ECTED TO THE INLET AIR COLLAR OF THE UNIT AND EITHER ATTACHED TO THE INLETAIRCOLLAROFTHETERMINATIONCAP OR TERMINATED IN THE CHIMNEY This option shows both exhaust and inlet air vent pipes attached to...

Page 12: ...XHAUST COLLAR GASKET TO INSURE POSITIVE EXHAUST SEAL SIDE VIEW TERMINATION CAP EXHAUST COLLAR ADAPTOR INLET AIR COLLAR STAINLESS STEEL FLEXIBLE PIPE PROVIDED 3 INCH COLLAR EXHAUST STARTING COLLAR WITH...

Page 13: ...ation must be performed by a licensed plumber or gas fitter NOTE Before the first firing of the fireplace the gas supply line should be purged of any trapped air NOTE Consult local building codes to p...

Page 14: ...ing of the gas supply piping system at test pressures equal to or less than one half 1 2 psig 3 5 kPa Step 6 Wiring the Fireplace NOTE Electrical wiring must be installed by a licensed electrician CAU...

Page 15: ...tch Place a dime size piece of glowing ember material near port holes in burner top sides and front see Figure 10 Figure 10 Placement of the Ember Material Space ember pieces about a 1 2 inch apart Ne...

Page 16: ...rs on the initial start up Turn it off and let it cool completely Remove and clean the glass Replace the glass and run the fireplace for an additional 8 hours This will help to cure the chemicals used...

Page 17: ...ompartment fireplace logs and burner areas surrounding the logs Checking Flame Patterns Flame Height Frequency Periodically By Qualified service technician Home owner Task Make a visual check of your...

Reviews: