Heat & Glo • SL-350TRS-CE-D • 2033-900 Rev. V • 3/13
36
Figure 54. Sealant Material
Installing the Trim
Combustible materials may be brought up to the speci-
fied clearances on the side and top front edges of the
fireplace, but
MUST NEvER
overlap onto the front
face. The joints between the finished wall, fireplace top
and sides can only be sealed with a 150º C minimum
sealant.
Install optional marble and brass trim surround kits as
desired. Marble, brass, brick, tile, or other noncombus-
tible materials can be used to cover up the gap between
the sheet rock and the fireplace.
Do not obstruct or modify the air inlet/outlet grilles.
When overlapping on both sides, leave enough space
so that the bottom grille can be opened and the trim
door removed.
Step 10
Installing Trim,
Logs, and
Ember Material
1. Apply only non-
combustible facing
material to the
fireplace surround.
cauTiON
wARNING: CHILDREN AND ADULTS
SHOULD BE ALERTED TO THE HAZARDS
if JOiNTs beTweeN The fiNisheD walls aND
The fireplace surrOuND (TOp aND siDes)
are sealeD, a 150º
c. miNimum sealaNT ma
-
Terial musT be useD. These JOiNTs are
NOT reQuireD TO be sealeD. ONly NONcOm
-
busTible maTerial (usiNG 150º c. miNimum
aDhesive, if NeeDeD) caN be applieD as
faciNG TO The fireplace surrOuND. see
The DiaGram belOw.
!
OF HIGH TEMPERATURES OF wORKING
SURFACES ON THESE HEATERS. wORKING
SURFACES INCLUDE ALL GLASS PANELS
AND DECORATIvE DOORS. YOUNG CHILDREN
SHOULD BE CAREFULLY SUPERvISED wHEN
THEY ARE IN THE SAME ROOM AS THE AP-
PLIANCE.
FINISH MATERIAL
MAY BE COMBUSTIBLE
-TOP AND SIDES OF UNIT-
SIDE
SEAL
JOINT
TOP SEAL
JOINT
1,27 cm
1,27 cm