15
Heat & Glo • COSMO32-IFT-B, COSMO36-IFT-B, COSMO42-IFT-B Installation Manual • 2619-980 Rev. G • 7/20
* Adjust framing dimensions for interior chase sheathing (such as sheetrock)
** If appliance is installed o
ff
of
fl
oor, maintain required clearances to combustibles. Construct platform in accordance with local building codes.
MINIMUM FRAMING DIMENSIONS*
Model
Size
A
B
C
D
E
F
G
H
I
J
K
Rough
Opening
(Vent Pipe)
Rough
Opening
(Height)
Rough
Opening
(Depth)
Rough
Opening
(Width)
Clearance
to Room
Ceiling
Combustible
Floor
Minimum
Hearth
Required
Behind
Appliance
Sides of
Appliance
Front of
Appliance
Clearance
to Ceiling
32
in.
8-5/8
36-1/2
17-3/4
37
31
0
0
1/2
1/2
36
56-7/8
mm
219
927
451
940
787
0
0
13
13
914
1445
36
in.
8-5/8
32-3/4
17-3/4
42
31
0
0
1/2
1/2
36
56-7/8
mm
219
832
451
1067
787
0
0
13
13
914
1445
42
in.
8-5/8
32-3/4
17-3/4
49
31
0
0
1/2
1/2
36
56-7/8
mm
219
832
451
1245
787
0
0
13
13
914
1445
Figure 3.7 Clearances to Combustibles
F
G
I
H
E
MEASURE FROM TOP
OF APPLIANCE OPENING
J
K
Framing
This appliance is designed to be recessed into combus-
tible framing with non-combustible material pre-installed
on top and side. Drywall or combustible materials (mini-
mum 1/2 inch thick) are designed to contact the non-
combustible material/appliance as called out in Section
10 Finishing.
This appliance has been thoroughly tested to minimize
drywall cracking and/or the protrusion of screws “screw
pops" when framed as shown below.
Framing should be done in a manner similar to framing a
window or door: Double-2x4/2x6 as a header for horizon-
tal strength and utilizing Jack or Trimmer stud fastened to
the King studs for vertical strength.
Note: Refer to Section 10 for important information
related to facing, drywall speci
fi
cations and decorative
barrier front information.
Note:
Header
MUST
be installed on end as shown in the diagram.
If elevating the appliance, the base of the appliance
should also be constructed in a similar manner to prevent
settling.
Refer to Figures 3.7, 3.8 and 3.9 for information regarding
framing when the Passive Heat Kit is installed. Install the
Passive Heat Kit per the instructions provided with the kit.
NOTE:
E & K dimensions will change if Passive Heat option is installed.
Reference the instructions included with the Passive Heat Kit.
A
B
C
D
HEADER: TWO 2 X 4’S OR 2 X 6’S
INSTALLED ON END
KING STUD
JACK (TRIMMER) STUD
APPLIANCE MAY BE
INSTALLED OFF
OF FLOOR**