Hearthstone Quality Home Heating Products, Inc.
Bristol DX Model 8763
41
glass. Peel the adhesive protecting paper away
from one end. Starting at the middle of the bottom
edge of the glass apply the gasket centered on
the edge of the glass. Continue to wrap the
gasket loosely around the edge until you meet at
the starting point. Adjust the gasket so the ends
do not overlap. If the gasket length is too long,
trim the excess. Do not leave ends with ragged
edges.
4. Firmly and evenly, fold the gasket around the
edges of the glass so it lies flat on the surface.
There should be no folds at the corners.
5. Place each gasketed glass back in its frame. With
four new 1/8” rivets reinstall the 2 glass clips on
the front glass frame. The glass assemblies are
now ready to remount on the unit.
If replacing entire glass with kit:
1. Follow instructions included in glass kit (Steps
1
– 11 under If Replacing Glass above).
WARNING! DO NOT USE SUBSTITUTE
MATERIALS. USE ONLY PARTS SUPPLIED BY
HEARTHSTONE THROUGH AN AUTHORIZED
HEARTHSTONE DEALER.
CAUTION! DO NOT CLEAN THE GLASS WHILE
THE UNIT IS HOT.
Venting Components
Venting should not need to be disassembled for
normal cleaning. However, if venting is required to
be removed for any reason, this should be done by a
qualified service person only. It is imperative that
the venting system be reinstalled according to the
particular manufacturer
’s specifications and this is
best performed by a professional.
Venting System Inspection
Periodic inspection of the venting system should be
performed by a qualified service person or agency at
least annually.