4 Using the HDG Euro – Lighting and reloading the HDG Euro
36
HDG Euro V3.0 with HDG Lambda Control 1 - V 1 - en
©
HDG Bavaria GmbH 06/2008
✓
The message
“Do not open, please wait”
appears in the
display of the HDG Lambda Control system.
✓
The flue fan starts to run.
✓
After approx. 15 seconds, the message
“Unlock filling
hatch”
appears.
2.
Press the lock (2) of the filling hatch (1) downward.
3.
Raise the filling hatch (1) up to the stop.
4.
Wait for approx. 10 seconds until the message
“Careful,
open slowly”
appears.
5.
Lift the lock of the filling hatch (1) and open the filling hatch slowly
until horizontal.
✓
The filling hatch opens automatically.
Figure 4/10 - Heating up / reloading
1
2
Figure 4/11 - Heating up / reloading
1