Flow at B and reux at A
1
WH - signal 0 V
2
GN - signal 12 V/24 V
3
GY - signal GND
3. Connect the hydraulic power pack to the electrical power supply.
4. Check the electrical connections after a week’s operating time.
HAWE Hydraulik SE
B 8543 - 10-2021 - 1.0
17/27