Step 4: Connect the Top tube with Bottom Tube by screwing them
together.
Step 5: Push the Table from the top of the Top Tube to above the
Decoration Tone and fix the table on the Decoration Tone by 4pcs M6*10
bolts.
Step 6: Push the Ash Tray from the top of the Top Tube to above the
Table.
Step 7 : Connect the Power Cord to the Socket in the heater Head.
Step 8: Push the Heater Head onto the Top Tube and fix in position using
the 2*10mm Screws.
Step 9: Fix the Power Cord on the Iron Base by using 4*15mm Screws.
Complete!