60
4000414930
E 10.15
USA / GB
General data
Cylinder inspection
MS0003
3.3 - MAJOR INSPECTION
A thorough inspection of the structural parts must be realized all the 5000 h or 10 years with disassembling
of the element to check the entirety of the welding. Each Cylinder must be disassembled and must be review
using non-destructive checks.
The criteria quoted above are applicable :
• Absence of deformation and visible damage.
• Absence of crack, broken welding, oxidation, glare of painting.
Check :
1.
Weld connection.
2.
Weld connection to piston rod.
3.
Bushe.
4.
Surface.
5.
Assembly and surface.
Summary of Contents for STAR 10
Page 2: ...2 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J ...
Page 10: ...10 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J A Preface Foreword Notes ...
Page 18: ...18 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J B Safety Notes ...
Page 32: ...32 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J C Familiarization Notes ...
Page 62: ...62 4000414930 E 10 15 USA GB General data Breaking test procedure MS0004 Notes ...
Page 66: ...66 4000414930 E 10 15 USA GB General data Torque Values MS0005 Notes ...
Page 72: ...72 4000414930 E 10 15 USA GB Chassis and turntable Slew ring inspection MS0010 Notes ...
Page 80: ...80 4000414930 E 10 15 USA GB Electric Electrical wiring MS0059 Notes ...
Page 116: ...116 4000414930 E 10 15 USA GB Hydraulics Hydraulic filter cartridge Replacement MS0050 Notes ...
Page 124: ...124 4000414930 E 10 15 USA GB Electric Battery ies MS0051 Notes ...
Page 144: ...144 4000414930 E 10 15 USA GB Mast Inspection of the slack chain sensors MS0062 Notes ...
Page 148: ...148 4000414930 E 10 15 USA GB Overriding system Overriding function reset MS0085 Notes ...