A
B
C
D
E
F
G
H
I
47
4000392130 E03.16
USA
/
GB
HT43RTJ PRO - HT132RTJ PRO
C
- Maintenance
5 - Reinforced inspection
Reinforced periodic inspection is a thorough inspection of the structure of the machine, to ensure the
full functionnality. It must occur at a frequency of 5 years or 2500 h.
This inspection is under the responsibility of the owner, and it must be conducted by a Haulotte Service
technician or qualified/authorized person.
This inspection should include the daily inspection and periodic inspection, refer to the manual for
details.
Reinforced inspection
In addition to the daily inspection
program
Visual inspection with small disassembly or movement needed to reach the part. Replacement is necessary.
Proof tests. Need HAULOTTE Services® authorization. For countries where machines are not subject to
controlled periodic maintenance.
Yes
No
Corrected
Not applicable
Work Platform. Floor, guardrails, access and extensions
No deterioration and visible damage
Lift assembly (jib, boom, mast, arm, turret)
No deterioration and visible damage
No abnormal gap in joints and slides
Frame, axle, steering system, stabilizers arms ...
No deterioration and visible damage
No foreign body in joints or slides
Condition of tires/tyres (wear, cutting, damage ...)
Rotation systems : orientation turret, basket and jib
No deterioration and visible damage
Slewing device screw and bolt presence and tightenning (if
equipped)
Pulleys, chains and wire rope
No deterioration and visible damage
No wear more than 2%
Pulleys and clamps are not worn, rusted or damaged
No radial gap > 0.5 mm on the pulleys on the pin
Absence of crack, damage or break of the device of fixation of
chains and wire rop
Summary of Contents for HT132RTJ PRO
Page 2: ...2 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO ...
Page 6: ...6 Maintenance book ...
Page 16: ...16 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO A Safety precautions Notes ...
Page 60: ...60 4000392130 E03 16 USA GB Control Oil change Wheel reducer E002 15 mn Notes ...
Page 62: ...62 4000392130 E03 16 USA GB Replacement Hydraulic filter cartridge E003 15 min Notes ...
Page 64: ...64 4000392130 E03 16 USA GB Filling up Oil change Fuel tank E004 15 mn Notes ...
Page 72: ...72 4000392130 E03 16 USA GB Replacement Tightening Wheel E006 15 min Notes ...
Page 74: ...74 4000392130 E03 16 USA GB Tightening Screws bolts and nuts E007 15 min Notes ...
Page 76: ...76 4000392130 E03 16 USA GB Control Oil change Turntable rotation gearbox E008 15 mn Notes ...
Page 82: ...82 4000392130 E03 16 USA GB Control Lubrication Chains E016 Notes ...
Page 98: ...98 4000392130 E03 16 USA GB Control Filling up Battery charge Battery E018 10 min Notes ...
Page 100: ...100 4000392130 E03 16 USA GB Lubrication Telescope E022 15 mn Notes ...
Page 104: ...104 4000392130 E03 16 USA GB Control Cable carrier cat track E048 30 min Notes ...
Page 108: ...108 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO D Diagnosis assistance Notes ...
Page 122: ...122 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO E Electric circuit Notes ...
Page 132: ...2 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 2 ENGINE UNIT II ...
Page 133: ...3 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 3 TURRET UNIT ...
Page 134: ...4 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 135: ...5 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 136: ...6 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 137: ...7 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 4 FRAME UNIT ...
Page 138: ...8 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 5 BASKET UNIT ...
Page 139: ...9 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 141: ...11 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 7 NEW ARCHITECTURE ...
Page 142: ...12 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 143: ...1 Hydraulic diagram HT43RTJ PRO HT132RTJ PRO 1 HT43RTJ PRO HT132RTJ PRO 1 1 FOLIO 1 1 ...
Page 144: ...2 Hydraulic diagram HT43RTJ PRO HT132RTJ PRO ...