38
4000392130
E03.16
USA / GB
HT43RTJ PRO - HT132RTJ PRO
C
- Maintenance
3 - Daily inspection
The content and method of inspection must be conducted by operators before using the machine, it
includes a visual inspection and functional and security systems testing of the machine.
This inspection is the responsibility of the user.
Each day and before the beginning of a new work period and with each change of operator, the
machine must be subjected to a visual inspection and a complete functional test. This inspection is
called Daily Inspection.
Any repairs required must be performed before the machine is used, its correct operation depends on it.
To tighten loosened hardware, refer to recommended torque value table in maintenance book.
In case of leaks, tighten or replace the damaged part before placing the machine in service.
In case of structural part deformation, cracks, broken weld, paint chipped, replace the part before
placing the machine in service.
Sample of broken welds
Inspection Forms are provided to assist your inspection process.
We recommend these forms to be completed daily and stored to assist with your maintenance
schedule.
Each action is depicted in the daily inspection sheet using the following symbols.
Visual inspection without disassembly
Lubrication-Greasing
Functional adjustments /
Checks
To drain off
To check by test
Tightening
Levelling
Systematic replacement
Visual inspection with small disassembly or
movement needed to reach the part.
Replacement is necessary.
Proof tests. Need HAULOTTE Services® authorization. For
countries where machines are not subject to controlled periodic
maintenance.
Summary of Contents for HT132RTJ PRO
Page 2: ...2 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO ...
Page 6: ...6 Maintenance book ...
Page 16: ...16 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO A Safety precautions Notes ...
Page 60: ...60 4000392130 E03 16 USA GB Control Oil change Wheel reducer E002 15 mn Notes ...
Page 62: ...62 4000392130 E03 16 USA GB Replacement Hydraulic filter cartridge E003 15 min Notes ...
Page 64: ...64 4000392130 E03 16 USA GB Filling up Oil change Fuel tank E004 15 mn Notes ...
Page 72: ...72 4000392130 E03 16 USA GB Replacement Tightening Wheel E006 15 min Notes ...
Page 74: ...74 4000392130 E03 16 USA GB Tightening Screws bolts and nuts E007 15 min Notes ...
Page 76: ...76 4000392130 E03 16 USA GB Control Oil change Turntable rotation gearbox E008 15 mn Notes ...
Page 82: ...82 4000392130 E03 16 USA GB Control Lubrication Chains E016 Notes ...
Page 98: ...98 4000392130 E03 16 USA GB Control Filling up Battery charge Battery E018 10 min Notes ...
Page 100: ...100 4000392130 E03 16 USA GB Lubrication Telescope E022 15 mn Notes ...
Page 104: ...104 4000392130 E03 16 USA GB Control Cable carrier cat track E048 30 min Notes ...
Page 108: ...108 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO D Diagnosis assistance Notes ...
Page 122: ...122 4000392130 E03 16 USA GB HT43RTJ PRO HT132RTJ PRO E Electric circuit Notes ...
Page 132: ...2 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 2 ENGINE UNIT II ...
Page 133: ...3 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 3 TURRET UNIT ...
Page 134: ...4 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 135: ...5 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 136: ...6 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 137: ...7 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 4 FRAME UNIT ...
Page 138: ...8 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 5 BASKET UNIT ...
Page 139: ...9 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 141: ...11 Electrical diagram HT43RTJ PRO HT132RTJ PRO 1 7 NEW ARCHITECTURE ...
Page 142: ...12 Electrical diagram HT43RTJ PRO HT132RTJ PRO ...
Page 143: ...1 Hydraulic diagram HT43RTJ PRO HT132RTJ PRO 1 HT43RTJ PRO HT132RTJ PRO 1 1 FOLIO 1 1 ...
Page 144: ...2 Hydraulic diagram HT43RTJ PRO HT132RTJ PRO ...