47
VTX A
6
| Rigging Manual
STEPS (TIGHTLY WRAPPED BOTTOM SECTIONS):
• Raise the suspended cluster of A6 and B15 cabinets, then align the cart of A6s on the ground underneath the suspended
cluster.
• Carefully lower the suspended cluster until the front attachment points are nearly touching. Check that the attachment points
are aligned, then lower the suspended cluster until the front attachment points join. Insert the two front pins.
• Use the electric hoist to raise the array. Be aware that the lower cluster may swing forward slightly as it lifts off the ground.
• Once the array is off the ground, grab the lower cluster by the handle at the rear of the Road Case and gently pull back towards
the rear of the array. While doing this, lower the array so that the front wheels of the Road Case touch the ground. Continue
lowering the array until the rear attachment points engage. Insert the two rear QRPs.
• With all four QRPs secured, lift the array off the ground and remove the Road Case Bottom.
1
2
3
5
4
10.3 DE-RIGGING THE ARRAY
The steps to de-rig a mixed array are the same as for a standalone A6 array. Follow the steps in Chapter 9 – Disassembling Arrays to
safely de-rig the array.
Summary of Contents for JBL Professional VTX Series
Page 1: ...VTX SERIES A6 Rigging Manual ...
Page 24: ...24 VTX A6 Rigging Manual 2 286 mm 90 in 2 434 mm 96 in 6 4 TRUCK PACKING ...
Page 42: ...42 VTX A6 Rigging Manual 9 4 REPEA T STEPS TO DISASSEMBLE THE ARRA Y ...
Page 53: ...53 VTX A6 Rigging Manual 11 5 MUL TI POINT CONFIGURA TION EXAMPLES ...
Page 65: ...65 VTX A6 Rigging Manual 13 7 GROUND ST ACK EXAMPLES VTX A6 BP VTX B28 VTX B28 GND VTX A6 ...
Page 77: ...VTX A6 Rigging Manual ...