STEPS:
• With the front QRPs set, use the electric hoist to raise the array. Be aware that the second cluster may swing forward slightly
as it lifts off the ground.
• Once the array is off the ground, grab the lower cluster by the handlebar on the Case Bottom and gently pull back towards the
rear of the array. While doing this, lower the array so the front wheels of the Case touch the ground. Lower the array until the
rear attachment points engage, then insert the two rear QRPs.
• Once all four QRPs have been secured, lift the array off the ground and remove the Case Bottom.
In some cases, the angle of the flown array may be too steep to fully connect to the cluster on the ground. This can happen when as-
sembling large arrays or when the frame pick-point is too far back as shown in the example below. In this situation, a two-step process
is used to engage all four connection points for the array.
1
2
3
1
2
2
Summary of Contents for JBL Professional VTX Series
Page 1: ...VTX SERIES A6 Rigging Manual ...
Page 24: ...24 VTX A6 Rigging Manual 2 286 mm 90 in 2 434 mm 96 in 6 4 TRUCK PACKING ...
Page 42: ...42 VTX A6 Rigging Manual 9 4 REPEA T STEPS TO DISASSEMBLE THE ARRA Y ...
Page 53: ...53 VTX A6 Rigging Manual 11 5 MUL TI POINT CONFIGURA TION EXAMPLES ...
Page 65: ...65 VTX A6 Rigging Manual 13 7 GROUND ST ACK EXAMPLES VTX A6 BP VTX B28 VTX B28 GND VTX A6 ...
Page 77: ...VTX A6 Rigging Manual ...