21
PF100
Combustion
Combustion
Fan Control
Hopper Lid
Control Cover
3 Speed Switch
Viewing Glass
Outer Door
Vent Pipe
Heat Exchanger
Outer Door Latches
Filter Box
Hopper
The Control
The control can be covered as shown above, or
uncovered as shown at left. There is a pair of slots pro-
vided for each position. Simply move the cover to the
desired position by placing the tabs on the cover in the
proper slots.
Fig. 40
Fig. 41
blower cover
Blower
Shaker Handle
Latches
WARNING: Do not operate with fire
chamber or ash removal doors open.
WARNING: Do not store fuel or other
combustible material within installation
clearance area.
CAUTION: Hot while in operation. Do
not touch. Keep children, clothing,
furniture, and other combustible material
out of the installation clearance area.
Operation
Summary of Contents for PF-100 Furnace
Page 11: ...11 PF100 Fig 19 Venting Configuration Graph Venting ...
Page 35: ...35 PF100 Feeder Parts ...
Page 40: ...40 PF100 Testing Label ...