HAPP 40
© 2013 HAPP Australia Pty Ltd
Version 8
20
|
P a g e
Installation
Important- prior to installation:
Ensure the hydraulic lines are pulled to the top of the column. And if the limit
switch cable is held in hydraulic clamps, remove the limit switch wires from
clamps and attached with cable ties.
It is easy to do this BEFORE You stand the column up.
Space required
The lift must be installed on a level concrete floor, detailed data of which as shown in
the following drawing
.
The lift installation concrete surface must be perfectly smooth.
Anchor bolt sizes vary depending on the shipment of the
hoist.Make sure you measure the size of your anchor bolts before
selecting your drill bit. Typically HAPP hoist shipments are 20mm in
size (M20).