- 29 -
ⓐ Examination method
- Operate the outrigger in appropriate location( about 10 ㎜ locations , ink etc.
used in load), turn off the engine in maximum rise state.
- After marking and 10 minutes please check descend status. (2 ㎜ or less
shrinkage )
ⓑ Caution
- Please stop the operation when quickly descend during operation as other
cylinder might be descend at the same time.
- If problem exists, please contact the company and the A/S.
2) Derrick cylinder normal descent
- When operation, derrick cylinder directly link to safety of worker and beforehand
please do maintenance inspections.
ⓐ Examination method
- 1/3 of the boom is out and 1 step boom is located parallel with the vehicle,
the tube and the load of derrick cylinder crack, mark to use ink etc.
- After marking and 10 minutes please check descend status. (2 ㎜ or less
shrinkage )
ⓑ Caution
- Please fold each step when quickly descend during operation, 1 step boom
should be elevated.
- If problem exists, please contact the company and the A/S.
3) Extension cylinder normal descent
ⓐ Examination method
- 50-60kg objects to be load on the boarding platform, mark the appropriate
location of each stage of contraction and expansion of the boom. ( two stages
and three , three stages and four )
- After marking and 10 minutes please check descend status. (3 ㎜ or less
shrinkage )
ⓑ Caution
- Please stop the operation when quickly descend during operation and operate
the contraction direction.
- If problem exists, please contact the company and the A/S.
Summary of Contents for HS Series
Page 1: ...Instruction Manual Repairing Guide MODEL HS2750 SMART HANSIN SPECIAL EQUIPMENT CO ...
Page 6: ... 5 Diagram of Equipment Composition ...
Page 9: ... 8 Diagram of Equipment Appearance ...
Page 10: ... 9 Working Radius Diagram ...
Page 11: ... 10 Hyd Component Circuit ...
Page 12: ... 11 Connective Diagram of Electricity ...
Page 13: ... 12 리모콘 송신기 메인 밸브 Connective Diagram of Electricity ...