- 28 -
A) Examination matters
- Checking the status of the leak connection parts
- Checking of negative pressure rises : separate measure to pressure gauge
B) Exchange matters
-First, completely shut down the operation of installation, after 5-10 minutes
operate the pressure light device in safe condition.
- To maintain cleanliness around should be cleaned thoroughly .
- Please loosen, hand or power tool . (When changing filter, remove excess
hydraulic fluid flow to replace the filter quickly)
- After changed, be careful not to loosed as this is fully tightened.
I. Examination cylinder
1) Descent of Outrigger cylinder
Outrigger cylinder influence a very large safety when design of installation, this
should need maintenance inspections thoroughly.
Summary of Contents for HS Series
Page 1: ...Instruction Manual Repairing Guide MODEL HS2750 SMART HANSIN SPECIAL EQUIPMENT CO ...
Page 6: ... 5 Diagram of Equipment Composition ...
Page 9: ... 8 Diagram of Equipment Appearance ...
Page 10: ... 9 Working Radius Diagram ...
Page 11: ... 10 Hyd Component Circuit ...
Page 12: ... 11 Connective Diagram of Electricity ...
Page 13: ... 12 리모콘 송신기 메인 밸브 Connective Diagram of Electricity ...