16
INST
ALLA
TION
Reservoir Immersion Installation
Detailed below a representation of a reservoir immersion installation scheme together with the
relevant components and the pH probe screwed into the threaded end of a user supplied pipe and
fastened with a bracket.
Position Description
1
Electrode holder tube
2
Bracket (user supplied)
3
Reservoir
4
Electrode