34
Install gable panels with the primed side facing up.
GABLE UNITS
PARTS REQUIRED:
x2
FINISH
Your gable units are now assembled.
Flush
Flush
1-3/4"
(4,5 cm)
1-1/2"
(3,8 cm)
Orient parts
AL
on the fl at side, as shown.
Place left gable panel as shown. Secure with 1-1/2" nails as shown.
1
BEGIN
2
Place right gable panel fl ush to left panel. Secure with 1-1/2" nails as shown.
Repeat STEPS to build a 2nd gable unit.
Flush
AL (on fl at)
AL
x4
2 x 4 x 7"
(5,1 x 10,2 x 17,8 cm)
x2
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
x24