96”
(243,8 cm)
96”
(243,8 cm)
32
You will build 7 rafter assemblies.
FINISH
Your rafters are now assembled.
PARTS REQUIRED:
RAFTERS
2" (5,1 cm)
x144
x12
AL
x1
2 x 4 x 7"
(5,1 x 10,2 x 17,8 cm)
Temporary Support
x14
2 x 4 x 55-9/16" (5,1 x 10,2 x 141,1 cm)
TZA
Fig. A
1/4"
(1,9 cm)
1/4"
(1,9 cm)
HINT:
Use floor and walls to help
assemble rafters!
Fit base of rafter flush to back wall studs
and wall panels.
AL
Temporary Support
Flush at peak.
BEGIN
1
Flush
to panel
Flush
to panel
2
Place (2) rafters
TZA
on top of temporary support
AL
and flush to inside of 12' eave wall panels.
Place gusset on top of rafters with 1/4" (19 mm) offset
(Fig. A)
.
Fasten gusset to rafters with (12) 2" nails in pattern shown.
For (2) rafters install (1) gusset and set aside.
(Fig. B)
.
For (5) rafters, flip over assembled rafter and install a second gusset
(Fig. C)
.
96"
(243,8 cm)
Fig. B -
Build 2
Fig. C -
Build 5
TZA