10
Gable Wall
Gable Wall
Gable Wall
Eave Wall
Eave Wall
Check that the floor frame is level after installing floor panels.
Re-level if needed.
• The floor should be used as a level work surface for wall construction.
• Organize your wall sections during sub-assembly to avoid over-handling of the walls.
HINT:
IMPORTANT!
Door centered on
Eave Wall
- Optional -
Door offset on
Eave Wall
- Optional -