background image

GB

91

Hang the side stone in place.

Hang the rear stone in position using the key holes in the 
side profiles.

Lift up the valence above the lower stone casing. Insert 
the valence flange into the soapstone groove, the 
ventilation grooves must now be facing the front stones. 
Insert the valence in the grooves towards the bottom 
plate.

Install the glass panels in the same way as the valence.

13

11

12

14

Summary of Contents for 35T

Page 1: ...GB 73 INSTRUCTIONS 34T 35T Installations...

Page 2: ...high quality standards regarding the environment Certification number 378 001 NOTE Report installation of a stove to your local authority The owner of the house is personally responsible for ensuring...

Page 3: ...and l family and hope that you will get a great deal of pleasure from your stove We understand that you place high demands on both quality and design As the new owner of a Hand l stove you have secure...

Page 4: ...by the length and area of the chimney and by how well sealed it is Minimum recommended chimney length is 3 5 m and a suitable cross section area is 150 200 cm 140 160 mm in diameter Carefully check t...

Page 5: ...ration must be at least 1 m 368 150 729 7 8 1 Combustible wall 267 100 415 400 300 100 300 200 100 690 Combustible wall Permitted area for combustible material H34T To prevent discolouration of painte...

Page 6: ...be at least 1 m 368 150 729 7 8 1 Combustible wall 267 100 415 400 300 100 300 200 100 690 Combustible wall Permitted area for combustible material H35T 217 50 50 325 Fire retardant wall of brick or c...

Page 7: ...duct should be insulated with 30 mm mineral wool covered with a moisture inhibitor plastic It is important that the lead in between the pipe and the wall or floor is sealed using jointing compound Whe...

Page 8: ...ey sweep Read the Instructions for Lighting the Hand l 30 series before lighting the fire for the first time Removing the loose parts Sweeping When sweeping the smoke baffle must be lifted out on the...

Page 9: ...ed by moving the spring between the three notches on the lever The angle of the stove also affects the closing force of the spring If the spring force seems weak despite the spring being mounted at th...

Page 10: ...on of the chimney can begin Installation of the surrounds for the respective models is described later on in these installation instructions The start pipe is placed over the connection on the insert...

Page 11: ...nected to the chimney Tap out the knock out in the rear panel using a hammer and cut the heat deflector on the rear side of the back panel Mount the back plate and install the connection pipe on the c...

Page 12: ...ust so that there is a gap of 426 mm between the top of the bottom plate and lower edge of the door check that the insert is vertical 1 2 Place the bottom plate on the floor according to the installat...

Page 13: ...screws locate in the grooves Align the front side profile lugs in the bottom plate and hook into the top frame Tighten the screws to the top frame IAttach the supplied type plates to the outside of th...

Page 14: ...in the same way as the lower side stones Screw 2 concrete screws in the front side stones Leave 3 mm between the stone and the screw flanges Hook the front side stone in the key holes and tighten the...

Page 15: ...he door and upper front stone is 4 mm If necessary the insert feet can be adjusted to achieve an even gap between both front stones and the door Install the mounting plate at the top edge on the lower...

Page 16: ...e so that the plastic feet are in the cut outs Adjust so that there is a gap of 423 mm between the top of the bottom plate and lower edge of the door check that the insert is vertical 1 2 Place the bo...

Page 17: ...screws locate in the grooves Align the front side profile lugs in the bottom plate and hook into the top frame Tighten the screws to the top frame Attach the supplied type plates to the outside of the...

Page 18: ...ten the screws carefully Place the upper front stone on top of the front side stones Secure using the 4 concrete screws IMPORTANT Check that the distance between the door and upper front stone is 4 mm...

Page 19: ...profiles Lift up the valence above the lower stone casing Insert the valence flange into the soapstone groove the ventilation grooves must now be facing the front stones Insert the valence in the gro...

Page 20: ...d the valence Then hook the lugs into the key holes 2 1 Hang the rear stone in place 18 16 15 17 Slide the front middle stone over the glass and the valence Then hook the lugs into the key holes Slide...

Page 21: ...GB 93 Install the upper rib on the silicone cones Then position the glass top soapstone top grate and cover 19...

Page 22: ...1 3 2 Heat tank to glass top Place the support plate for the stones on top of the lower rib piece Place the hot air damper on the silicone cones Then position the glass panel grate and cover Place th...

Page 23: ...e Cut off the damper at the rear edge using cutting pliers Then break off the damper from the rib at the front edge Mount the rib on to the silicone cones Position the soapstone top and place the damp...

Page 24: ...NIBE AB NIBE STOVES Box 134 285 23 Markaryd www handol eu Nibe Stoves reserves the right to change colours materials dimensions and models at any time without special notice Your dealer can provide yo...

Reviews: