HAMWORTHY HEATING LTD
3
Wessex ModuMax
mk3
Boilers
500001308/C
2.0 SUPPLY AND DELIVERY
Your boiler is despatched to site as a pre
-
assembled and tested unit. It is the installers responsibility to
convey the boiler to the plantroom.
Ensure the boiler is kept secure when handling to avoid it toppling, as this will result in damage.
Each 2 and 3 high stacked Wessex ModuMax model is supplied with a flue collector manifold. This is
separately packaged in a dedicated cardboard box. Single Wessex ModuMax boilers do not have an
additional flue collector manifold.
NOTE:
Care must be taken as impacts will cause damage to the flue collector manifold.