HAMWORTHY HEATING LTD
9
WESSEX MODU
MAX
100 SERIES
500001123/C
Open Tundi sh
Condense ‘U’ Tr ap
Minimum Fa ll 30 mm/m
(1 in 30)
Boi ler Flu e
Me tal she ath to protect
plastic pi pe
The vo lume of con densate
is r ela ted to the syste m w ater
temperat ure and fi ring rate
of boil er.
4.5 Condensate Connections
•
Provision must be made for removal of condensate from the boiler and flue system.
•
Condense is mildly acidic, typically pH3 - pH5.
•
Condense pipework must be non-corrosive and not copper. Hamworthy recommend
32mm dia. Plastic waste pipe.
•
Condense may be discharged to a standard drain subject to National or Local
regulations.
•
Location of condense pipework should prevent freezing within tundishes, traps and
pipework.
•
The connection to the boiler condense drain accepts a straight push-fit coupling for
32mm i.d. plastic waste pipe.
Boiler Condensate
Connection
(32mm o/d)
Figure 4.5.1 - Boiler Condensate Connection
Figure 4.5.2 – Boiler Condensate Connection