2.0 SUPPLY & DELIVERY
Your boiler is despatched to site as a tested unit. The main
boiler block is supplied in a crate, with the flue assembly &
accessories in separate cartons. Each boiler is delivered by a tail
lift vehicle & lowered to ground level. It is the installers
responsibility to convey the boiler to the plantroom.
The boiler is supplied in three packages.
- boiler assembly
- accessory pack assembly
- flue assembly
The crate is designed to be transported on site by a standard pallet truck. The package dimensions are shown in the table
below:
Reverse Return Header Sets
Where reverse return header sets are used these are packaged separately from the boilers. Ancillary items such as
isolation valves & flexible boiler connectors are packaged in a cardboard box on the same pallet. The dimensions of these
packages are shown below:
Delivery Verification
When taking delivery please ensure that you have received the correct number of boilers & ancillary packages to
fulfil your order. If any item is missing please contact our after sales service team. Please provide details of your
order such as order number & contract number as well as a detailed description of the missing item.
Header Kit Frame Kit
Model
Depth
Width
Height
Weight
Sherborne SE 64he
740mm
550mm
870mm
83kg
Sherborne SE 71c
87kg
Accessory pack
840mm
750mm
550mm
25kg
Standard Concentric Flue assy 1050mm
260mm
150mm
3kg
Model
Configuration
Length
mm
Weight
kg
SE 64he & 71c 2 boilers
1200
35
SE 64he & 71c 3 boilers
1200
50
SE 64he & 71c Frame
1400
20
Summary of Contents for Sherborne Series
Page 2: ......
Page 10: ...HAMWORTHY HEATING LTD 8 SHERBORNE 500001167 E 4 Boiler Layout Description 4 1 Accessory Pack...
Page 27: ...HAMWORTHY HEATING LTD 25 SHERBORNE 500001167 E...
Page 29: ...HAMWORTHY HEATING LTD 27 SHERBORNE 500001167 E 8 9 Wiring Diagram...
Page 30: ...HAMWORTHY HEATING LTD 28 SHERBORNE 500001167 E 8 10 Wiring Diagram LMU...
Page 53: ......
Page 54: ......