Chapter 4. Installation
EQ-99X Operation & Maintenance Manual
31
of
45
4.6 Water Cooling Components for EQ-99 CAL
Note
: The following procedure
only
applies to the EQ-99-CAL model of the EQ-99X system.
The following section details how to connect the water cooling components that come packaged with the EQ-99-CAL
system.
To properly complete the water cooling installation, you must have the items listed below:
4.6.1 EQ-99 CAL Water Cooling Installation Procedure
To assemble the water cooling components of the EQ-99-CAL system:
1. Calibrated EQ-99 Lamp Head
2.
Swagelok Fittings [¼” OD to ¼” OD] (Qty: 2)
3.
¼” OD Tubing [8ft length individually] (Qty: 2)
4. Solid State Cooling Systems UC160-190 Chiller (not shown)
EQ-99-CAL Lamp Head Assembly
Figure 21.
1. Attach the Swagelok fittings to the two pieces of copper tubing as shown in the figure
a.
The ¼” end of the fitting will mate to the copper tubing.
b.
A 9/16” and ½” wrench are required in order to complete the attachment.