Halsey Taylor CONTOUR HRFER-EE-Q Owner'S Manual Download Page 9

9

97880C - 2/05

HRFEREEQ*C   HRFEREEQ*2C   HRFSEREEQ*C

DO NOT SOLDER

 tubes while

inserted into the strainer as
damage to o-rings may result.

12.

These products are designed to operate on 20-105
PSIG supply line pressure.

 If inlet pressure is above 105

PSIG, a pressure regulator must be installed in the supply
line.

Any damage caused by connecting
these products to a supply line with
pressure lower than 20 PSIG or
higher than 105 PSIG IS NOT
covered under warranty.

13.

Make electrical connections to the chiller.

 See chiller

instructions.

14.

Check stream height from bubbler.

 Stream height is

factory set at 35-40 PSI. If supply pressure varies greatly
from this, please do the following. For 

Pushbutton units

only

, adjust the screw on regulator (Item 29) by using a

small screwdriver through the small hole in the push button
(Item 20). See Figure 20. Clockwise adjustment will raise
stream height and counterclockwise movement will lower
stream height. For 

Electronic sensor units only

, remove

bottom access panel and turn adjustment screw on the
regulator (Item 29 - Fig. 21). Clockwise adjustment will raise
stream height and counterclockwise movement will lower
stream height. For best adjustment, stream height should be
approximately 1-1/2” (38mm) above the bubbler guard. (See
Figure 14).

15.

Mount lower panel.

 Loosen the two (2) #10-24 x 5/8”

(16mm) screws at frame bottom lip. Slide upper tongue of
lower panel under lower edge of already installed upper
panel. Tighten previously loosened screws securely.

16.

Replace bottom access panel

 to fountain basin using

screws provided. Tighten securely.

Figure 13 – Lower Panel Installation

Figure 15 – HRFER-EE-Q Tube Routing

Figure 14 – Stream Height

Figure 16 – HRFSER-EE-Q Tube Routing

CHILLER

INLET

44

27

CHILLER

OUTLET

33

27 - TO

BUBBLER

CHILLER
INLET

44

27

CHILLER

OUTLET

32

27 - TO

BUBBLER

27

27

11.

Turn on water supply and check for leaks.

 Release air

from tank by interrupting infrared beam; a steady stream of
water assures all air is removed. The sensor has a 30
second maximum 

ON

 time. It may be necessary to step away

from beam a few times to allow chiller tank to fill.

27

Summary of Contents for CONTOUR HRFER-EE-Q

Page 1: ...LER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit...

Page 2: ...ER EE Standard Reach Arm Extended Reach Arm EE Bottom Cover Standard Reach Bottom Cover Extended Reach EE Bubbler Gasket Screw 10 24 x 62 HHMS Screw 5 16 18 x 75 Hex Nut 5 16 18 Screw 10 24 x 50 PHTC...

Page 3: ...2 43 44 N S Fitting 1 4 NPTF Cap Screw 6 32 x 25 Drain Assy Includes items 39 thru 43 Strainer Ferrule Assy Drain Trap Fitting Elbow 1 4 Tailpipe Gasket Rubber Washer Strainer Supplied with Chiller Al...

Page 4: ...obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to...

Page 5: ...m holes and fasten the assembly to the wall opening using appropriately sized screws or bolts and nuts not provided MODEL HRFSER EE Q FINISHED FLOOR 18 457mm 5 8 16mm 12 1 4 311mm 12 305mm 1 25mm 11 2...

Page 6: ...to obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up...

Page 7: ...rt loose ends of rods into holes on sides of shelf panel Using appropriately sized screws or bolts not provided fasten the shelf and frame to the bottom of wall opening Secure the frame sides and top...

Page 8: ...n the marked chiller inlet port See Figs 15 16 Attach an unplated and deburred copper water inlet line and a service stop not provided to the chiller Turn on the water supply and flush the line thorou...

Page 9: ...Electronic sensor units only remove bottom access panel and turn adjustment screw on the regulator Item 29 Fig 21 Clockwise adjustment will raise stream height and counterclockwise movement will lower...

Page 10: ...e mechanism or operates erratically check the following a Ensure there are no obstructions within a 40 inch radius from the front of fountain b Check wire connections at the solenoid valve and at the...

Page 11: ...C Figure 22 Fountain Assembly Side View Figure 21 Electronic Sensor Fountain Assembly 2222 CAMDEN COURT OAK BROOK IL 60523 630 574 3500 PRINTEDINU S A 40 25 See Fig 19 30 15 16 23 12 19 29 26 31 5 10...

Reviews: