Halsey Taylor CONTOUR HRFER-EE-Q Owner'S Manual Download Page 8

8

HRFEREEQ*C   HRFEREEQ*2C   HRFSEREEQ*C

97880C - 2/05

7.

Install fountain.

 Remove bottom access panel on

underside of fountains and 

SAVE

 the screws. Mount

the fountains to the upper panel and frame with

(4) 5/16” x 3/4” (19mm) long bolts and nuts provided.

Tighten securely.

Figure 12 – Fountain Installation

Figure 11 – Upper Panel Installation

8.

Connect the fountain drain waste tube to the building
sanitary sewer system.

 Connection should be made in

compliance with local plumbing code requirements. (Note:
Plumbing trap is not included with the fountain).

9.

Make connection between solenoid valve assembly
and fountain(s).

 Insert the 1/4” poly tubing coming from the

fountain with sensor into the solenoid valve. Insert the 1/4”
poly tubing coming from the fountain with push button into
the tee (See Figs. 15 & 16).

10.

Connect power cord of sensor to solenoid valve by
running it through the back panel and connecting it
as shown in Fig. 18.

 Connectors may be connected to

either terminal on solenoid valve. Attach ground wire to
solenoid valve bracket with green ground screw.

3.

Attach solenoid valve assembly to the underside of
cross member of mounting frame on electronic
sensor unit. 

(See Figs. 5 and 8).

4.

Make water supply connections.

 Inlet port is marked on

the chiller (1/4” O.D. copper tube). Bend the copper tube
(provided) at an appropriate length from the chiller to opening
in frame. Install the in-line strainer (provided with chiller) by
pushing it in until it reaches a positive stop, approximately
3/4” (19mm) on the marked chiller inlet port (See Figs. 15 &
16). Attach an unplated and deburred copper water inlet line
and a service stop (not provided) to the chiller. Turn on the
water supply and flush the line thoroughly.

5.

Make connection between remote chiller outlet tube
and solenoid valve assembly. 

Outlet port is marked on

the chiller (1/4” O.D. copper tube). Install a 1/4” union/tee
(provided) on the marked chiller outlet port. Insert one end of
1/4” poly tubing into the union/tee and the other end into the
straight fitting on the solenoid valve assy (See Figs. 15 & 16)

6.

Hang the upper panel on the mounting frame hange

r.

Align holes in the panel with the holes in the mounting frame.
Be sure that panel is engaged with hanger at top of frame
before releasing it.

Special Tools

Item

Description

Quantity

None

Item

Description

Quantity

Additional Materials

1

  Unplated copper inlet pipe

REQUIRED TOOLS AND MATERIALS

These tables show special tools and/or additional materials (not
provided) which are necessary to complete installation of these

units:

HRFER-EE-Q/SER-EE-Q INSTALLATION

1.

Assemble and

 place frame in wall as shown on preceding

pages.

2.

Install chiller:

 Remove front panel of chiller. 

Remove and

discard cardboard inner pack from between
compressor and side panel.

 Slide chiller onto the shelf

and position it to the left on the shelf.

NOTE:

Building construction must allow for adequate air
flow on both sides, top and back of chiller. A
minimum of 4” (102mm) on both sides and top is
required. See chiller installation for additional
instructions.

2

  Service Stop

Figure 10 – Chiller Installation

Note:

  With the 

HRFSER-EE-Q

 model, the standard reach

           fountain must be mounted at the upper position on
            panel.

Summary of Contents for CONTOUR HRFER-EE-Q

Page 1: ...LER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit...

Page 2: ...ER EE Standard Reach Arm Extended Reach Arm EE Bottom Cover Standard Reach Bottom Cover Extended Reach EE Bubbler Gasket Screw 10 24 x 62 HHMS Screw 5 16 18 x 75 Hex Nut 5 16 18 Screw 10 24 x 50 PHTC...

Page 3: ...2 43 44 N S Fitting 1 4 NPTF Cap Screw 6 32 x 25 Drain Assy Includes items 39 thru 43 Strainer Ferrule Assy Drain Trap Fitting Elbow 1 4 Tailpipe Gasket Rubber Washer Strainer Supplied with Chiller Al...

Page 4: ...obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to...

Page 5: ...m holes and fasten the assembly to the wall opening using appropriately sized screws or bolts and nuts not provided MODEL HRFSER EE Q FINISHED FLOOR 18 457mm 5 8 16mm 12 1 4 311mm 12 305mm 1 25mm 11 2...

Page 6: ...to obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up...

Page 7: ...rt loose ends of rods into holes on sides of shelf panel Using appropriately sized screws or bolts not provided fasten the shelf and frame to the bottom of wall opening Secure the frame sides and top...

Page 8: ...n the marked chiller inlet port See Figs 15 16 Attach an unplated and deburred copper water inlet line and a service stop not provided to the chiller Turn on the water supply and flush the line thorou...

Page 9: ...Electronic sensor units only remove bottom access panel and turn adjustment screw on the regulator Item 29 Fig 21 Clockwise adjustment will raise stream height and counterclockwise movement will lower...

Page 10: ...e mechanism or operates erratically check the following a Ensure there are no obstructions within a 40 inch radius from the front of fountain b Check wire connections at the solenoid valve and at the...

Page 11: ...C Figure 22 Fountain Assembly Side View Figure 21 Electronic Sensor Fountain Assembly 2222 CAMDEN COURT OAK BROOK IL 60523 630 574 3500 PRINTEDINU S A 40 25 See Fig 19 30 15 16 23 12 19 29 26 31 5 10...

Reviews: