Halsey Taylor CONTOUR HRFER-EE-Q Owner'S Manual Download Page 6

6

HRFEREEQ*C   HRFEREEQ*2C   HRFSEREEQ*C

97880C - 2/05

CHILLER SHELF

P/N 27638C

HOOK RODS (2)

P/N 101567443730

INSTALL (2) SCREWS

(P/N 101008343890) IN FRAME

BEFORE INSTALLING IN OPENING

5/16" SCREWS OR BOLTS

(10 REQ'D - NOT PROVIDED)

FRAME

SCREWS OR BOLTS

(NOT PROVIDED)

Figure 7 – HRFER-EE-Q Rough-In

Figure 8 – Rough-In Assembly

Single-Station Mounting Frame

Models

HRFER-EE-Q

1.

Cut a rectangular wall opening 

18-3/4” (475 mm) W x

37-3/4” H (959 mm) and 4-1/2” (114 mm) above the floor line
(see Figure 8). The dimensions are required to obtain proper
rim and bubbler heights for compliance with ANSI standard
A117.1.

2.

Reinforce the wall opening 

on all sides to adequately

support the water fountain. This reinforcement must support
up to 150 lbs. static load and provide a means for securing
the frame assembly in place.

NOTE:

 Building construction must allow for adequate air flow

on both sides and top of remote chiller unit.
Minimum of 4” (102 mm) is required.

3.

Install plumbing and electrical rough-ins.

 A junction box

for a (3) wire, 10 amp branch circuit is provided on the
inside of the chiller. (Standard 120 Volts, 60 Hz, and single
phase.)

4.

Remove frame and related hardware

 from packaging.

Release the two shelf rods by cutting cable ties.

15

18

Summary of Contents for CONTOUR HRFER-EE-Q

Page 1: ...LER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit...

Page 2: ...ER EE Standard Reach Arm Extended Reach Arm EE Bottom Cover Standard Reach Bottom Cover Extended Reach EE Bubbler Gasket Screw 10 24 x 62 HHMS Screw 5 16 18 x 75 Hex Nut 5 16 18 Screw 10 24 x 50 PHTC...

Page 3: ...2 43 44 N S Fitting 1 4 NPTF Cap Screw 6 32 x 25 Drain Assy Includes items 39 thru 43 Strainer Ferrule Assy Drain Trap Fitting Elbow 1 4 Tailpipe Gasket Rubber Washer Strainer Supplied with Chiller Al...

Page 4: ...obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to...

Page 5: ...m holes and fasten the assembly to the wall opening using appropriately sized screws or bolts and nuts not provided MODEL HRFSER EE Q FINISHED FLOOR 18 457mm 5 8 16mm 12 1 4 311mm 12 305mm 1 25mm 11 2...

Page 6: ...to obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up...

Page 7: ...rt loose ends of rods into holes on sides of shelf panel Using appropriately sized screws or bolts not provided fasten the shelf and frame to the bottom of wall opening Secure the frame sides and top...

Page 8: ...n the marked chiller inlet port See Figs 15 16 Attach an unplated and deburred copper water inlet line and a service stop not provided to the chiller Turn on the water supply and flush the line thorou...

Page 9: ...Electronic sensor units only remove bottom access panel and turn adjustment screw on the regulator Item 29 Fig 21 Clockwise adjustment will raise stream height and counterclockwise movement will lower...

Page 10: ...e mechanism or operates erratically check the following a Ensure there are no obstructions within a 40 inch radius from the front of fountain b Check wire connections at the solenoid valve and at the...

Page 11: ...C Figure 22 Fountain Assembly Side View Figure 21 Electronic Sensor Fountain Assembly 2222 CAMDEN COURT OAK BROOK IL 60523 630 574 3500 PRINTEDINU S A 40 25 See Fig 19 30 15 16 23 12 19 29 26 31 5 10...

Reviews: