![Halsey Taylor CONTOUR HRFER-EE-Q Owner'S Manual Download Page 4](http://html1.mh-extra.com/html/halsey-taylor/contour-hrfer-ee-q/contour-hrfer-ee-q_owners-manual_581257004.webp)
4
HRFEREEQ*C HRFEREEQ*2C HRFSEREEQ*C
97880C - 2/05
5/16" SCREWS OR BOLTS
(12 REQ'D - NOT FURNISHED)
FRAME
5/16" HEX NUT
(4 REQ'D - PROVIDED)
P/N 111577343890
BOLT FRAMES TOGETHER
WITH 5/16" x 3/4" (19mm) BOLTS
(4 REQ'D - PROVIDED)
P/N 111577243890
INSTALL (3) SCREWS
(P/N 111008342890) IN FRAME
BEFORE INSTALLING IN OPENING
SCREWS OR BOLTS
(NOT PROVIDED)
HOOK RODS (2)
P/N 101567442730
CHILLER SHELF
P/N 27638C
Figure 4 – HRFSER-EE-Q Rough-In
Figure 5 – Rough-In Assembly
Dual-Station Mounting Frame
Models
HRFSER-EE-Q
1.
Cut a rectangular wall opening
37-1/2” (953 mm) W x
37-3/4” H (959 mm) and 4-1/2” (114 mm) above the floor line
(see Figure 5). The dimensions are required to obtain proper
rim and bubbler heights for compliance with ANSI standard
A117.1.
2.
Reinforce the wall opening
on all sides to adequately
support the water fountain. This reinforcement must support
up to 150 lbs. static load and provide a means for securing
the frame assembly in place.
NOTE:
Building construction must allow for adequate air
flow on both sides and top of remote chiller unit a
minimum of 4” (102 mm) is required.
3.
Install plumbing and electrical rough-ins.
A junction box
for a (3) wire, 10 amp branch circuit is provided on the
inside of the chiller. (Standard 120 Volts, 60 Hz, and single
phase.)
4.
Remove frames and related hardware
from packaging.
Release the two shelf rods by cutting cable ties. Attach the
two frames together through the upright supports with (4)
5/16” x 3/4” (19 mm) long bolts and nuts (provided). Tighten
securely.
15
18