background image

1

. The wiring method should be in line with the local wiring standard.

2

. After installation, the power plug should be easily reached.

3

.  A  breaker should be incorporated into fixed wiring. The breaker should be

all-pole switch.

Outdoor unit

Install according to

Drawing for the installation of indoor and outdoor units

ƽ

and the bending radius should be 30 (1 1/6) to 40 mm (1 4/7) or longer.

Connecting the pipe of gas side first makes working easier.

ƽ

The connection pipe is specialized for R410A.

ƽ

Installation of Outdoor Unit

Half union

Flare nut

Torque wrench

The standard pipe length is 7m (27 9/16) . If it is over 7m (27 9/16) , the function

of the unit will be affected. If the pipe has to be lengthened, the refrigerant should

be charged, according to 20 g/m (0.018 oz/inch). But the charge of refrigerant must

be conducted by professional air conditioner servicer. Before adding additional
refrigerant, perform air purging from the refrigerant pipes and indoor unit using
a vacuum pump,then

Spanner

Forced fastening without careful centering may
damage the threads and cause a leakage of gas.

Pipe Diameter(ǿ)

Fastening torque

Liquid side6.35mm(1/4")

18N.m/13.3Ft.lbs

Liquid/Gas side9.52mm(3/8")

42 N.m/30.1Ft.lbs

Gas side 12.7mm(1/2")

55N.m/40.6Ft.lbs

Gas side 15.88mm(5/8")

60 N.m/44.3Ft.lbs

Connection of pipes

charge additional refrigerant.

Outdoor unit

Indoor unit

A

B

Outdoor unit

Indoor unit

A

B

A

B

Outdoor unit

Indoor unit

Oil trap

CAUTION

Max.Elevation: Amax=1

m

In case the elevation A is more

than 5m, oil trap shoud be
installed every

20ft (6

m

)

Max. Length: Bmax=15m

In case the pipe length  B  is

more than 10m, the refrigerant
should be charged, according
to 20 g/m.

3

Connection

If the drain-elbow is used,

ƽ

please attach it as figure. (Note:
Only for heat pump unit.)

1.

Open the handle on low side of manifold and 

2.

operate vacuum pump. If the low

3.

After the completion of vacuuming, close the handle ‘Lo’ in gaugemanifold and
stop the operation of the vacuum pump.

Attaching Drain-Elbow

Purging Method:To use vacuum pump

Open the valve rod stem the 2-way valve counterclockwise to 90 degrees.

4.

After 6 seconds, close the 2-way valve and inspect for gas leakage.

Power cable:

HSU12VHJ(DB)-W

Outdoor unit

3

2

^

Power
Wiring

1

)

(N

)

(L

)

(C

3

2

1

)

(N

)

(L

)

(C

Indoor unit

Power cable:

ƽ

ƽ

ƽ

ƽ

ƽ

ƽ

Take off the panel(top), by removing the 5 screws. 

Remove the plugs on the conduit plate.

Temporarily mount the conduit tubes on the conduit plate.

Connect both the power supply and unit wire harness to

the corresponding terminals on the terminal board.

Ground the unit in accordance with local codes.

Allow several extra inches of wire for making wiring

connections.

Use lock nuts to secure conduit tubes.

ƽ

To bend a pipe, be careful not to crush the pipe,

HSU09VHJ(DB)-W

HSU24VHJ(DB)-W

HSU18VHJ(DB)-W

HSU12XCK-W

HSU09XCK-W

Power cable:

Power cable:

Power cable:

Power cable:

       

        

3

wire

 1

4

AWG

2wire with ground  1

2

AWG

2wire with ground  1

2

AWG

2wire with ground  1

2

AWG

2wire with ground  1

2

AWG

2wire with ground  1

2

AWG

2wire with ground  1

2

AWG

Outdoor unit

Indoor unit

Remove the service port cap of the 3-way valve and the valve stem cap for both 
valves. Connect the low pressure hose from the manifold set to the 3-way valve. 
Connect the center hose to the vacuum pump.

side gauge reaches a vacuum immediately, ensure the hoses are connected 
properly and the low side manifold handle is open.

Vacuum for a minimum of 

30

 minutes

,pull vacuum to 600 microns

.

Leave the hoses connected and check 

the vacuum level again in 

5

-

10

 minutes. If you lose the vacuum, ensure all 

connections are tight and flare the tubes again if needed.

Ensure that no dirt or debris enters the pipe.

Control Wiring

All models: Control cable: 4wire,  1

4

AWG

≥3wire 
1

4

AWG

 

Reviews: